TickSig
Indicator guide

Market strength

Measures changes in a volume/value-based average cost.

Pane or chart instructionSwitch to Chinese

Purpose and construction

Measures changes in a volume/value-based average cost.

Market strength is applied to the chart series using the local definition below. Each period counts one bar on the active chart. The same period therefore covers a different amount of time on daily and intraday charts.

How to read it

Read its slope and smoothing; input units and data quality matter.

Confirm the inputs and settings before comparing the indicator with price. On an open bar, close, extremes and volume can still change, so the reading can update before the bar closes.

Parameters

ParameterDefault
N13
M5

Parameter names match the variables in the calculation. After changing a lookback or smoothing period, recalculate on the same data to compare response speed. Defaults from another platform may not match this definition.

Actual application chart

The current market data and inputs did not produce a verifiable indicator output. No figure is shown; simulated prices are not substituted for indicator output.

Local calculation

The local definition is shown below. Display labels can be translated; the case calculation uses original source identifiers. A shared indicator name does not guarantee identical calculations across platforms.

DIVE:=0.01*EMA(AMOUNT,N)/EMA(VOL,N);
CYR:(DIVE/REF(DIVE,1)-1)*100;
MACYR:MA(CYR,M);

Limitations

  • Read its slope and smoothing; input units and data quality matter.
  • Timeframe, adjustments, warm-up length and data units affect results. Align these before comparing charts.

Questions

Why can Market strength differ across platforms?

Compare inputs, default periods, smoothing, offsets and data units before comparing the final value. This guide uses the local source definition rather than assuming that an external example has the same settings.

Does the example show a real trade?

No. Figures show the indicator running on historical market data in the application. They contain no executed orders and make no return or win-rate claim.

References

The calculation comes from the project’s indicator registry. Primary references below provide related conceptual reading. Figures are captured from the running application.